Light Rail Lines
Gold Line
The first light rail line of the RT, which opened in 1987, was an 18.3-mile (29.5 km) route between Watt/I-80 station in North Sacramento, through downtown, and continuing east on Folsom Blvd. to Butterfield Way station. It was built at a cost of $176 million (1987), including the cost of vehicles and maintenance and storage facilities. Much of the line, when it was first built, was single-tracked, though improvements over the 1990s allowed much of the original system to be double-tracked. The line was built mainly using a railroad right-of-way, coupled with use of structures of an abandoned freeway project. A limited portion of the route runs on streets, mainly in downtown Sacramento.
Surprisingly, the line became more popular than anyone anticipated—in fact, so popular that further expansions and improvements were necessary. Two new stations at 39th and 48th streets opened in 1995, and a 2.3-mile (3.7 km) extension to the Mather Field/Mills station opened in 1998. In June 2004, a further extension from Mather Field/Mills to Sunrise was opened.
On September 26, 2003, the South Line (now part of the Blue Line) opened for 6.3 miles (10.1 km) between the 16th Street station on the Watt/I-80-Downtown-Mather Field/Mills line and a station at Meadowview Road in the south end, which is the first phase of a planned longer 11.2-mile (18.0 km) line to Elk Grove. Much of the extension follows a railroad right-of-way. When it opened, 7 new stops were added to the system.
In June 2005, following a reconfiguration of the light rail system, the Sunrise-Downtown Line was created (it formerly continued beyond the downtown St. Rose of Lima Park station to Watt/I-80); it runs from St. Rose/K-Street to Sunrise with an extension to the Folsom area that opened on October 15, 2005. It has since been re-designated in color as the Gold Line. On December 8, 2006 it was extended even further to the downtown Amtrak depot (a.k.a. the Sacramento Valley Station); connecting the light rail system to the national rail system for the first time.
Surprisingly, the line became more popular than anyone anticipated—in fact, so popular that further expansions and improvements were necessary. Two new stations at 39th and 48th streets opened in 1995, and a 2.3-mile (3.7 km) extension to the Mather Field/Mills station opened in 1998. In June 2004, a further extension from Mather Field/Mills to Sunrise was opened.
On September 26, 2003, the South Line (now part of the Blue Line) opened for 6.3 miles (10.1 km) between the 16th Street station on the Watt/I-80-Downtown-Mather Field/Mills line and a station at Meadowview Road in the south end, which is the first phase of a planned longer 11.2-mile (18.0 km) line to Elk Grove. Much of the extension follows a railroad right-of-way. When it opened, 7 new stops were added to the system.
In June 2005, following a reconfiguration of the light rail system, the Sunrise-Downtown Line was created (it formerly continued beyond the downtown St. Rose of Lima Park station to Watt/I-80); it runs from St. Rose/K-Street to Sunrise with an extension to the Folsom area that opened on October 15, 2005. It has since been re-designated in color as the Gold Line. On December 8, 2006 it was extended even further to the downtown Amtrak depot (a.k.a. the Sacramento Valley Station); connecting the light rail system to the national rail system for the first time.
Blue Line
The first light rail line of the RT opened March 12, 1987. Initial service commenced between Watt/I-80 and 8th & O stations only for the first six months. It was extended to Butterfield that same year on September 5. In all, it was an 18.3-mile (29.5 km) route between Watt/I-80 station in North Sacramento, through downtown, and continuing east on Folsom Blvd. to Butterfield Way station. It was built at a cost of $176 million (1987), including the cost of vehicles and maintenance and storage facilities. Much of the line, when it was first built, was single-tracked, though improvements over the 1990s allowed much of the original system to be double-tracked. The line was built mainly using a railroad right-of-way, coupled with use of structures of an abandoned freeway project. A limited portion of the route runs on streets, mainly in downtown Sacramento.
Surprisingly, the line became more popular than anyone anticipated—in fact, so popular that further expansions and improvements were necessary. Two new stations at 39th and 48th streets opened in 1995, and a 2.3-mile (3.7 km) extension to the Mather Field/Mills station opened in 1998. In June 2004, a further extension from Mather Field/Mills to Sunrise was opened.
On September 26, 2003, the South Line opened for 6.3 miles (10.1 km) between the 16th Street station on the Watt/I-80-Downtown-Mather Field/Mills line and a station at Meadowview Road in the south end, which is the first phase of a planned longer 11.2-mile (18.0 km) line to Elk Grove. Much of the extension follows a railroad right-of-way. When it opened, 7 new stops were added to the system. Following a June 2005 reconfiguration of the light rail lines, the South Line merged with the Watt I-80/Downtown line (formerly part of the previous Watt/I-80-Downtown-Sunrise line) effectively combining the old line with the new, and was re-designated the Blue Line. The former original portion of the Watt/I-80-Downtown-Folsom line was re-designated the Gold Line.
Surprisingly, the line became more popular than anyone anticipated—in fact, so popular that further expansions and improvements were necessary. Two new stations at 39th and 48th streets opened in 1995, and a 2.3-mile (3.7 km) extension to the Mather Field/Mills station opened in 1998. In June 2004, a further extension from Mather Field/Mills to Sunrise was opened.
On September 26, 2003, the South Line opened for 6.3 miles (10.1 km) between the 16th Street station on the Watt/I-80-Downtown-Mather Field/Mills line and a station at Meadowview Road in the south end, which is the first phase of a planned longer 11.2-mile (18.0 km) line to Elk Grove. Much of the extension follows a railroad right-of-way. When it opened, 7 new stops were added to the system. Following a June 2005 reconfiguration of the light rail lines, the South Line merged with the Watt I-80/Downtown line (formerly part of the previous Watt/I-80-Downtown-Sunrise line) effectively combining the old line with the new, and was re-designated the Blue Line. The former original portion of the Watt/I-80-Downtown-Folsom line was re-designated the Gold Line.
Green Line
The "starter" arm
The Green Line is a light rail transit line in the Sacramento Regional Transit District light rail system. The first arm opened on June 15, 2012 which ran from the 13th Street Station to the Township 9 Station and the whole line is projected to run from the Sacramento Valley Station to the Sacramento International Airport, running through north downtown, Township 9, Natomas on the way to the Airport.